Our History

2023

  • Hong Kong Disneyland Resort Project — Arendelle Completion Package successfully Completed.
  • Awarded the following significant projects:

    • Demolition, Foundation, Superstructure and Associated Works Contract For Redevelopment of Kwong Wah Hospital (Phase 2)
    • Improvement Works at Mui Wo, Phase 2 Stage 2;
    • Design & Construction of Public Housing Development at Kwu Tung North Area 19, Phase 2
    • Construction of Trunk Sewage Rising Main in Cheung Sha Wan

DJI_0162

Yip Shing Street_1

2022

  • The Tseung Kwan O-Lam Tin Tunnel and the Cross Bay Link project, involved by Chun Wo-STEC-CMGC JV, were officially opened. In addition, Chun Wo Tunnel Management Limited won a contract for the management, operation, and maintenance of this tunnel.
  • Awarded the following significant projects:
    • Relocation of Diamond Hill Fresh Water and Salt Water Service Reservoirs to Caverns
    • Sau Nga Road Stormwater Storage Scheme
    • Construction of a 30-classroom Primary School and a 6-classroom Kindergarten at Site E-1, Development of Anderson Road Quarry Site, Sai Kung
    • Uprating of Pui O Raw Water Pumping Station and Pui O No. 2 Raw Water Pumping Station and Laying of Raw Water Mains along South Lantau Road
    • Drainage Improvement Works in Tsim Sha Tsui
    • Construction of Open Space at Eastern Street North, Sai Ying Pun 
  • Chun Wo’s use of “Steel MiC” systems allowed for a block with a 4-storey transitional housing, “Yip Shing Street 6," to be completed in less than 3 weeks, which is a significant reduction of nearly 80% compared to traditional methods. 

2021

  • URA and Chun Wo Pioneer in Concrete Modular Integrated Construction to Build Hong Kong’s First Private Residential Project
  • Awarded the following significant projects:
    • Construction of San Shek Wan Sewage Treatment Works, Associated Submarine Outfall and Pui O Sewerage Works
    • Main Contract for the Proposed Composite Development at Nos. 12-30, Hang On Street, Kwun Tong, Kowloon
    • Piling Works for Integrated Basement and Underground Road in Zones 2B & 2C of the West Kowloon Cultural District
    • Development of Lok Ma Chau Loop: Main Works Package 1 - Contract 1 Site Formation and Infrastructure Works inside Lok Ma Chau Loop and Western Connection Road Phase 1
2021 - MiC

 

 

2020

  • 2020 Chun Wo adopts “SAP Analytics Cloud”, an industry-leading business intelligence solution, to Speed Up its Digital Transformation
  • Awarded the following significant projects:
    • Fanling North New Development Area, Phase 1: Fanling Bypass Eastern Section (Shek Wu San Tsuen North to Lung Yeuk Tau)
    • In-situ Reprovisioning of Sha Tin Water Treatment Works
    • Foundation for Public Housing Development at Tung Chung Area 99 Kwu Tung North New Development Area, Phase 1 : Roads and Drainage between Kwu Tung North New Development Area and Shek Wu Hui
    • Shek Wu Hui Effluent Polishing Plant - Main Works Stage 1 - Civil Works for Sewage Treatment Facilities
    • Revamp of Public Toilets at Terminal Buildings
    • Hong Kong Disneyland Resort Project Arendelle - Completion Package

2019

Chun Wo Tunnel Management Limited has been awarded a 4-year management contract for thr management, operation and maintenance services of the Central - Wan Chai Bypass Tunnel. Since the commencement of operation of the Tunnel in Jan 2019, the Group has managed a total of six tunnels in Hong Kong, the remaining five are the Cross-Harbour Tunnel, the Shing Mun Tunnels, the Tseung Kwan O Tunnel, the Kai Tak Tunnel and the Lion Rock Tunnel.

 

2018

Awarded with Tseung Kwan O - Lam Tin Tunnel. Tseung Kwan O Interchange and Associated Works.

Launched the "Chun Wo Innovation Student Awards" to encourage students to come up with innovative engineering solutions to help developming countries tackle sustainable development issues.

 

2017

With the Group expanding its business in the Asia Pacific and overseas markets, the Group's long-term strategic goal is to be a force in Asia and to expand alliances of the Group across the region. "Chun Wo Development Holdings Limited" has become a major branch of the Group. The operations of Chun Wo including construction and property development continue to be carried out under the "Chun Wo" brand to develop its businesses.

2016

  • The Group's shares will be traded on the Stock Exchange of Hong Kong Limited )"SEHK") under the new short names of "Asia Allied Infrastructure" and "亞洲聯合基建控股". Stock code remains unchanged as "00711".
  • Chun Wo has been awarded with the following projects:
    • Site Formation and Infrastructure Works for Development of Anderson Road Quarry Site
    • Construction of Public Rental Housing Redevelopment at Pak Tin Estate Phases 7 and 8
Asset6

 

 

 

2015

Chun Wo has been awarded with the following projects:

  • Main Contract for Subsidized Sale Flats Project at Shatin Area 36C
  • Design and Construction of New Territories West Regional Office and Water Resources Education Centre of Water Supplies Department
  • In-situ Reprovisioning of Shatin Water Treatment Works (South Works) - Advance Works (Contract No. 3/WSD/15)

2014

Chun Wo has been awarded with the following projects:

  • HK-Zhuhai-Macao Bridge HK Boundary Crossing Facilities, Passenger Clearance Building and Public Transport
  • Contract No. AC168: Main Contract Works for the Retail Expansion of City of Dreams, Macau

2013

Chun Wo has been awarded with the following projects:

  • Construction of Kwun Tong Promenade (Stage 2)
  • MTR Contract No. 1107 — Shatin to Central Link: Diamond Hill to Kai Tak Tunnels
  • MTR Contract No. 1108- Shatin to Central Link, Kai Tak Station and Associated Tunnels
LC3C0279

2012

  • Chun Wo has been awarded with the following:
    • Superstructure Works for the Proposed Composite Development at Yuet Wah Street and Hip Wo Street, Kwun Tong
    • Completion of the Design and Construction of Expansion of Tseung Kwan O Hospital and achievement in the Green Building Award 2012 (Finalist)

2011

Chun Wo has been awarded with the following:

  • Central-Wan Chai Bypass Tunnel (North Point Section) and Island Eastern Corridor Link
  • Proposed Tsz Shan Monastery Development at Tai Po
  • “Gold Award of Safety Management System Award in 10th Hong Kong Occupational safety & Health Award”

2010

Chun Wo has been awarded with the following:

  • Wan Chai Development Phase II — Central-Wan Chai Bypass at Wan Chai East
  • MTR Contract No. 771B — West Island Line: Building Services for Kennedy Town Station
  • “Caring Company Award” for more than 5 consecutive years from the Hong Kong Council of Social Service since 2005
 

2009

Chun Wo has been awarded with the following projects:

  • Wan Chai Development Phase II – Central–Wan Chai Bypass at Hong Kong Convention and Exhibition Centre
  • The University of Hong Kong, 1,800 Places Student Residence, Pokfulam
  • Redevelopment of The Hong Kong Sports Institute Contract 1 Works and Temporary Velodrome in Whitehead, Shatin
  • Construction Works of Tuen Mun Western Trunk Sewerage
reem diamond-8794

 

2008

Entered the Middle East market with initial investments in two residential projects namely ‘Reem Diamond’ and ‘Le Cube’ in Al Reem Island of Abu Dhabi, United Arab Emirates (UAE)Developed partnership alliance with Enigin PLC for the new business of energy saving industry in China

2007

  • Pre-sold apartments of The Metropolis at Yangzhou and Phase 1B of Arc de Royal at Shijiazhuang
  • Completed the improvement works to Lok Ma Chau San Tin Interchange
  • Completed the construction of Skyplaza & SkyPier People Mover Tunnel
  • The Group officially changed the company name to “Chun Wo Development Holdings Limited”

2006

Pre-sold 340 apartments of Phase 1A of Arc de Royal at Shijiazhuang

Opened the Choi Hung Park-and-Ride Public Carpark of No. 8 Clear Water Bay Road.

2005

  • Awarded the major Airport Extension Project (The SkyPlaza & SkyPier People Mover Tunnel Works)
  • Commenced the residential and commercial development in Shijiazhuang, Yangzhou and Yixing
  • Ventured into Macau: awarded contracts by Venetian Macau in Cotai, Macau, for the foundation works and construction of congress and event centre of the Las Vegas style casino and resort
  • Awarded the design & build Highways project (Lok Ma Chau San Tin Interchange Improvement Project)
  • Completed the construction of various prestigious residential buildings (The Pacifica, Bel Air, No. 8 Clear Water Bay Road etc.)
    Completed five separate projects for an international theme park located at Penny Bay , Lantau Island
  • Awarded a large scale building project above the Guangzhou MTR Huang Sha Station
  • Accredited ISO14000 (Chun Wo E&M Engineering Limited and Chun Wo Foundations Limited)

2004

Jointly undertook the development and construction of a major property development in Ho Chi Minh City, Vietnam

Awarded 1 trackwork project for an international theme park at Penny Bay, Lantau Island

Accredited ISO 9001 (City Security Company Limited, City Professional Management Limited and Chun Long Construction Limited)

Completed the railway trackwork projects (MTRC Tsim Sha Tsui Extension, Ma On Shan Rail and Taiwan High Speed Rail)

Completed the construction of various prestigious residential buildings (Vianni Cove, Princeton Tower etc.)

2003

  • Awarded 4 projects for an international theme park located at Penny Bay, Lantau Island (Site development, Government Landscaped Area & Public Transport Interchange, Coach & Car Park, adventure theme park)

  • Awarded Zhan Tian You Civil Engineering Award of the Hunghom Bypass and Princess Margaret Road Link Project
  • Accredited ISO14001 (Environmental Management System)
  • Completed the property development project in Mainland China (Elite Lodge in Zhongshan)
  • Completed the MTRC West Rail station project, including trackwork projects, design, construction and commissioning of approximate 5.5km viaduct and 4.3km viaduct from Kam Tin to Tin Shui Wai and from Tin Shui Wai to Tuen Mun North respectively
2003-jpg

 

2002

Awarded the maintenance contract of the Passenger Terminal Building at the Hong Kong International Airport

Awarded construction contracts for public transport interchange and property development enabling works for MTRC Ma On Shan Rail Tai Wai Station and Wu Kai Sha Station

2001

Undertook for the first time as both the developer and contractor for the Choi Hung Park and Ride Development

Undertook the first project related to an international theme park at Penny Bay, Lantau Island (The Sunny Bay Fresh Water Service Reservoir)

Participated in the construction of permanent way and trackworks projects of MTRC East Rail Extension, Ma On Shan and Tsim Sha Tsui Extension

Completed the construction of various prestigious residential projects (Serenade Cove etc)

2000

Completed the construction of various prestigious residential projects
( Manhattan Heights, South Bay Palace Tower II, etc.)

Participated in the largest Private Sector Participation Scheme (PSPS) in Hong Kong
(Grandeur Terrace in Tin Shui Wai Area 111, with 4,100 flats)

Signed the Safety Charter

Acquired City Professional Management Limited, expanding the business into property management
Undertook the renovation project of MTRC Hunghom Station

 

1999

  • Awarded 3 MTRC West Rail projects of over HK$32 billion (Construction of Tin Shui Wai Station, construction of viaduct from Kam Tin to Tin Shui Wai & from Tin Shui Wai to Tuen Mun North)
  • Participated in the MTRC West Rail Permanent Way - Northern Area project
  • Accredited confirmation in Group C under the Buildings Category with the then Works Bureau (i.e. the present Development Bureau)
  • Awarded the foundations project of MTRC Kowloon Airport Express Line (AEL) Station

1998

  • Established Chun Wo E&M Engineering Company Limited
  • Awarded the civil engineering maintenance contract of runway, taxiway and bridges at Hong Kong International Airport
  • Undertook the large diameter bored piling works for MTRC Tung Chung Station
  • Participated in the construction project of MTRC Tseung Kwan O Extension - Black Hill Tunnels
  • Completed the construction of various commercial buildings in Mainland China (International Financial Plaza in Beijing, New China Hong Kong Office Building in Beijing etc.)

1997

  • Participated in the first Private Sector Participation Scheme (PSPS) project ( Grand View Garden, Hammer Hill Road, with 2,230 flats)
  • Accredited ISO9001 (Building & Design)
  • Awarded the environmental protection engineering project (Tseung Kwan O Landfill)
  • Awarded various prestigious residential building contracts (Laguna Verde etc.)
  • Established City Security Company Limited

1996

Participated in the construction project of Hunghom Bypass & Princess Margaret Road Links

Accredited confirmation in Group C under Waterworks Category with the then Works Branch Government Secretariat (i.e. the present Development Bureau)

1990 - 1995

  • Awarded the Peak Tower redevelopment project
  • Awarded the diaphragm wall construction project for commercial/residential development and large diameter bored piling works (Tseung Kwan O Town Lot no. 27)
  • Listed in HK Stock Exchange
  • Accredited ISO9002 (Building)
  • Awarded the building construction and roadworks projects (Scout Association of Hong Kong Headquarters & Lion Rock Tunnel Road reconstruction & improvement works)
  • Established Chun Wo Foundations Limited
  • Established Chun Wo (China) Limited
  • Awarded the first renovation works of US Consulate in Guangzhou
  • Awarded the construction works of over 10-mile high pressure gas pipeline at Tai Mo Shan Country Park
  • Accredited confirmation in Group C under Site Formation Category with the then Works Branch Government Secretariat (i.e. the present Development Bureau)

1986 - 1989

  • Awarded the first environmental protection engineering project (Landfill Improvement in Sai Tso Wan, Kowloon)
  • Awarded the highways and drainage works in Kowloon, and accredited confirmation in Group C under Roads and Drainage Category with the then Lands and Works Branch Government Secretariat (i.e. the present Development Bureau)
  • Awarded the first bridge & roadworks project (Fanling New Town), including the first underground tunnel construction in Hong Kong
  • Awarded the Homantin & Tai Tam reservoir waterworks projects

1980 - 1985

Awarded the renovation works of MTRC Sheung Wan Station

Awarded the maintenance works of Tolo Harbour highway

Awarded the MTRC trackwork project (Construction of double-tracking from Tai Po Market & Sheung Shui)

Awarded the renovation project of Lo Wo bridge and station platform

1970 - 1979

Awarded the first railway project (Renovation of MTRC Shatin Station)

Awarded the first site formation project (Siu Lik Yuen in Shatin)

Awarded the first seawall construction project (City One in Shatin)

1968 - 1969

Established Chun Wo by Mr. Pang Kam Chun. The Group started off as a constructor of private sector construction; later involved in constructing buildings of various types and functions for the government as well as for private developers.

 

 

2021
  • URA and Chun Wo Pioneer in Concrete Modular Integrated Construction to Build Hong Kong’s First Private Residential Project
  • Awarded the following significant projects:
    • Construction of San Shek Wan Sewage Treatment Works, Associated Submarine Outfall and Pui O Sewerage Works
    • Main Contract for the Proposed Composite Development at Nos. 12-30, Hang On Street, Kwun Tong, Kowloon
    • Piling Works for Integrated Basement and Underground Road in Zones 2B & 2C of the West Kowloon Cultural District
    • Development of Lok Ma Chau Loop: Main Works Package 1 - Contract 1 Site Formation and Infrastructure Works inside Lok Ma Chau Loop and Western Connection Road Phase 1

2020

  • 2020 Chun Wo adopts “SAP Analytics Cloud”, an industry-leading business intelligence solution, to Speed Up its Digital Transformation
  • Awarded the following significant projects:
    • Fanling North New Development Area, Phase 1: Fanling Bypass Eastern Section (Shek Wu San Tsuen North to Lung Yeuk Tau)
    • In-situ Reprovisioning of Sha Tin Water Treatment Works
    • Foundation for Public Housing Development at Tung Chung Area 99 Kwu Tung North New Development Area, Phase 1 : Roads and Drainage between Kwu Tung North New Development Area and Shek Wu Hui
    • Shek Wu Hui Effluent Polishing Plant - Main Works Stage 1 - Civil Works for Sewage Treatment Facilities
    • Revamp of Public Toilets at Terminal Buildings
    • Hong Kong Disneyland Resort Project Arendelle - Completion Package

2019

Chun Wo Tunnel Management Limited has been awarded a 4-year management contract for thr management, operation and maintenance services of the Central - Wan Chai Bypass Tunnel. Since the commencement of operation of the Tunnel in Jan 2019, the Group has managed a total of six tunnels in Hong Kong, the remaining five are the Cross-Harbour Tunnel, the Shing Mun Tunnels, the Tseung Kwan O Tunnel, the Kai Tak Tunnel and the Lion Rock Tunnel.

2018

Awarded with Tseung Kwan O - Lam Tin Tunnel. Tseung Kwan O Interchange and Associated Works.

Launched the "Chun Wo Innovation Student Awards" to encourage students to come up with innovative engineering solutions to help developming countries tackle sustainable development issues.

2017

With the Group expanding its business in the Asia Pacific and overseas markets, the Group's long-term strategic goal is to be a force in Asia and to expand alliances of the Group across the region. "Chun Wo Development Holdings Limited" has become a major branch of the Group. The operations of Chun Wo including construction and property development continue to be carried out under the "Chun Wo" brand to develop its businesses.

2016

  • The Group's shares will be traded on the Stock Exchange of Hong Kong Limited )"SEHK") under the new short names of "Asia Allied Infrastructure" and "亞洲聯合基建控股". Stock code remains unchanged as "00711".
  • Chun Wo has been awarded with the following projects:
  • Site Formation and Infrastructure Works for Development of Anderson Road Quarry Site
  • Construction of Public Rental Housing Redevelopment at Pak Tin Estate Phases 7 and 8

2015

 

Chun Wo has been awarded with the following projects:
  • Main Contract for Subsidized Sale Flats Project at Shatin Area 36C
  • Design and Construction of New Territories West Regional Office and Water Resources Education Centre of Water Supplies Department
  • In-situ Reprovisioning of Shatin Water Treatment Works (South Works) - Advance Works (Contract No. 3/WSD/15)

2014

Chun Wo has been awarded with the following projects:
  • HK-Zhuhai-Macao Bridge HK Boundary Crossing Facilities, Passenger Clearance Building and Public Transport
  • Contract No. AC168: Main Contract Works for the Retail Expansion of City of Dreams, Macau

2013

Chun Wo has been awarded with the following projects:
  • Construction of Kwun Tong Promenade (Stage 2)
  • MTR Contract No. 1107 — Shatin to Central Link: Diamond Hill to Kai Tak Tunnels
  • MTR Contract No. 1108- Shatin to Central Link, Kai Tak Station and Associated Tunnels

2012

Chun Wo has been awarded with the following:
  • Happy Valley Underground Stormwater Storage Scheme(The biggest New Engineering Contract “NEC” project ever awarded by the Hong Kong Government)
  • Superstructure Works for the Proposed Composite Development at Yuet Wah Street and Hip Wo Street, Kwun Tong
  • Completion of the Design and Construction of Expansion of Tseung Kwan O Hospital and achievement in the Green Building Award 2012 (Finalist)

2011

Chun Wo has been awarded with the following:
  • Central-Wan Chai Bypass Tunnel (North Point Section) and Island Eastern Corridor Link
  • Proposed Tsz Shan Monastery Development at Tai Po
  • “Gold Award of Safety Management System Award in 10th Hong Kong Occupational safety & Health Award”

2010

Chun Wo Tunnel Management Limited has been awarded a 4-year management contract for thr management, operation and maintenance services of the Central - Wan Chai Bypass Tunnel. Since the commencement of operation of the Tunnel in Jan 2019, the Group has managed a total of six tunnels in Hong Kong, the remaining five are the Cross-Harbour Tunnel, the Shing Mun Tunnels, the Tseung Kwan O Tunnel, the Kai Tak Tunnel and the Lion Rock Tunnel.

2009

Chun Wo has been awarded with the following projects:

  • Wan Chai Development Phase II – Central–Wan Chai Bypass at Hong Kong Convention and Exhibition Centre
  • The University of Hong Kong, 1,800 Places Student Residence, Pokfulam
  • Redevelopment of The Hong Kong Sports Institute Contract 1 Works and Temporary Velodrome in Whitehead, Shatin
  • Construction Works of Tuen Mun Western Trunk Sewerage

2008

Entered the Middle East market with initial investments in two residential projects namely ‘Reem Diamond’ and ‘Le Cube’ in Al Reem Island of Abu Dhabi, United Arab Emirates (UAE)Developed partnership alliance with Enigin PLC for the new business of energy saving industry in China

2007

  • Pre-sold apartments of The Metropolis at Yangzhou and Phase 1B of Arc de Royal at Shijiazhuang
  • Completed the improvement works to Lok Ma Chau San Tin Interchange
  • Completed the construction of Skyplaza & SkyPier People Mover Tunnel
  • The Group officially changed the company name to “Chun Wo Development Holdings Limited”

2006

Pre-sold 340 apartments of Phase 1A of Arc de Royal at Shijiazhuang

Opened the Choi Hung Park-and-Ride Public Carpark of No. 8 Clear Water Bay Road.

2005

  • Awarded the major Airport Extension Project (The SkyPlaza & SkyPier People Mover Tunnel Works)
  • Commenced the residential and commercial development in Shijiazhuang, Yangzhou and Yixing
  • Ventured into Macau: awarded contracts by Venetian Macau in Cotai, Macau, for the foundation works and construction of congress and event centre of the Las Vegas style casino and resort
  • Awarded the design & build Highways project (Lok Ma Chau San Tin Interchange Improvement Project)
  • Completed the construction of various prestigious residential buildings (The Pacifica, Bel Air, No. 8 Clear Water Bay Road etc.)
    Completed five separate projects for an international theme park located at Penny Bay , Lantau Island
  • Awarded a large scale building project above the Guangzhou MTR Huang Sha Station
  • Accredited ISO14000 (Chun Wo E&M Engineering Limited and Chun Wo Foundations Limited)

2004

Jointly undertook the development and construction of a major property development in Ho Chi Minh City, Vietnam

Awarded 1 trackwork project for an international theme park at Penny Bay, Lantau Island

Accredited ISO 9001 (City Security Company Limited, City Professional Management Limited and Chun Long Construction Limited)

Completed the railway trackwork projects (MTRC Tsim Sha Tsui Extension, Ma On Shan Rail and Taiwan High Speed Rail)

Completed the construction of various prestigious residential buildings (Vianni Cove, Princeton Tower etc.)

2003

  • Awarded 4 projects for an international theme park located at Penny Bay, Lantau Island (Site development, Government Landscaped Area & Public Transport Interchange, Coach & Car Park, adventure theme park)
    Awarded Zhan Tian You Civil Engineering
  • Award of the Hunghom Bypass and Princess Margaret Road Link Project
  • Accredited ISO14001 (Environmental Management System)
  • Completed the property development project in Mainland China (Elite Lodge in Zhongshan)
  • Completed the MTRC West Rail station project, including trackwork projects, design, construction and commissioning of approximate 5.5km viaduct and 4.3km viaduct from Kam Tin to Tin Shui Wai and from Tin Shui Wai to Tuen Mun North respectively

2002

Awarded the maintenance contract of the Passenger Terminal Building at the Hong Kong International Airport

Awarded construction contracts for public transport interchange and property development enabling works for MTRC Ma On Shan Rail Tai Wai Station and Wu Kai Sha Station

2001

Undertook for the first time as both the developer and contractor for the Choi Hung Park and Ride DevelopmentUndertook the first project related to an international theme park at Penny Bay, Lantau Island (The Sunny Bay Fresh Water Service Reservoir)Participated in the construction of permanent way and trackworks projects of MTRC East Rail Extension, Ma On Shan and Tsim Sha Tsui ExtensionCompleted the construction of various prestigious residential projects (Serenade Cove etc)

2000

Completed the construction of various prestigious residential projects
( Manhattan Heights, South Bay Palace Tower II, etc.)

Participated in the largest Private Sector Participation Scheme (PSPS) in Hong Kong
(Grandeur Terrace in Tin Shui Wai Area 111, with 4,100 flats)

Signed the Safety Charter

Acquired City Professional Management Limited, expanding the business into property management
Undertook the renovation project of MTRC Hunghom Station

1999

  • Awarded 3 MTRC West Rail projects of over HK$32 billion (Construction of Tin Shui Wai Station, construction of viaduct from Kam Tin to Tin Shui Wai & from Tin Shui Wai to Tuen Mun North)

  • Participated in the MTRC West Rail Permanent Way - Northern Area project

  • Accredited confirmation in Group C under the Buildings Category with the then Works Bureau (i.e. the present Development Bureau)

  • Awarded the foundations project of MTRC Kowloon Airport Express Line (AEL) Station

1998

  • Established Chun Wo E&M Engineering Company Limited
  • Awarded the civil engineering maintenance contract of runway, taxiway and bridges at Hong Kong International Airport
  • Undertook the large diameter bored piling works for MTRC Tung Chung Station
  • Participated in the construction project of MTRC Tseung Kwan O Extension - Black Hill Tunnels
  • Completed the construction of various commercial buildings in Mainland China (International Financial Plaza in Beijing, New China Hong Kong Office Building in Beijing etc.)

1997

  • Participated in the first Private Sector Participation Scheme (PSPS) project ( Grand View Garden, Hammer Hill Road, with 2,230 flats)
  • Accredited ISO9001 (Building & Design)
  • Awarded the environmental protection engineering project (Tseung Kwan O Landfill)
  • Awarded various prestigious residential building contracts (Laguna Verde etc.)
  • Established City Security Company Limited

1996

Participated in the construction project of Hunghom Bypass & Princess Margaret Road Links

Accredited confirmation in Group C under Waterworks Category with the then Works Branch Government Secretariat (i.e. the present Development Bureau)

1990 - 1995

  • Awarded the Peak Tower redevelopment project
  • Awarded the diaphragm wall construction project for commercial/residential development and large diameter bored piling works (Tseung Kwan O Town Lot no. 27)
  • Listed in HK Stock Exchange
  • Accredited ISO9002 (Building)
  • Awarded the building construction and roadworks projects (Scout Association of Hong Kong Headquarters & Lion Rock Tunnel Road reconstruction & improvement works)
  • Established Chun Wo Foundations Limited
  • Established Chun Wo (China) Limited
  • Awarded the first renovation works of US Consulate in Guangzhou
  • Awarded the construction works of over 10-mile high pressure gas pipeline at Tai Mo Shan Country Park
  • Accredited confirmation in Group C under Site Formation Category with the then Works Branch Government Secretariat (i.e. the present Development Bureau)

1986 - 1989

  • Awarded the first environmental protection engineering project (Landfill Improvement in Sai Tso Wan, Kowloon)
  • Awarded the highways and drainage works in Kowloon, and accredited confirmation in Group C under Roads and Drainage Category with the then Lands and Works Branch Government Secretariat (i.e. the present Development Bureau)
  • Awarded the first bridge & roadworks project (Fanling New Town), including the first underground tunnel construction in Hong Kong
  • Awarded the Homantin & Tai Tam reservoir waterworks projects

1980 - 1985

  • Awarded the renovation works of MTRC Sheung Wan Station
  • Awarded the maintenance works of Tolo Harbour highway
  • Awarded the MTRC trackwork project (Construction of double-tracking from Tai Po Market & Sheung Shui)
  • Awarded the renovation project of Lo Wo bridge and station platform

1970 - 1979

  • Awarded the first railway project (Renovation of MTRC Shatin Station)
  • Awarded the first site formation project (Siu Lik Yuen in Shatin)
  • Awarded the first seawall construction project (City One in Shatin)

1968 - 1969

Established Chun Wo by Mr. Pang Kam Chun. The Group started off as a constructor of private sector construction; later involved in constructing buildings of various types and functions for the government as well as for private developers.