Bored Piling and Precast Prestressed Concrete Piling Contract at Area 3 for MGM  Cotai Project, MGM Grand Paradise, Macau

Client

MGM Grand Paradise S.A.


Period

Mar 2013 - Oct 2013

Construction of 47 Nos. of 3000mm diameter bored piles, 135 Nos. of Precast Pre-stressed concrete piles and assoicated testings