Home >

What We Construct

Express Rail Link - Contract 803C West Kowloon Terminus Piles (Site A - South)

Client

MTR Corporation Limited


Period

Jan 2010 - Jan 2011

Key FeaturesA) Carry out 166 nos. pre-drilling holes;B) Construction of 65 nos. of large diameter bored piles where 45 nos. with steel stanchion embedded;C) Construction of 727 nos. of socket H-piles;D) Demolition of existing of toilet structure, PTI ground slab and portion of box culvert.