MTR Contract No. 1119 — Shatin to Central Link: Trackwork and Overhead Line Modification Works at Lo Wu and Pat Heung Depot

Client

MTR Corporation Ltd.


Period

Jan 2012 - Jan 2015

The Works include the design, manufacture, supply, delivery, installation, testing, commissioning and integrated tests for the Trackwork, Overhead Line System, Drainage and Ancillary Works in accordance with the requirements of the Contract Tracksworks comprise construction, supply, delivery, installation, testing and commissioning of the approximately 7.0 km of new track at the existing Pat Heung Depot.